The first operation on most parts and the easiest one to under-specify. Shearing is fast and leaves a slightly deformed end; sawing is slower and leaves a square one; abrasive and laser cutting each have their own heat-affected edge. On studs and threaded rod the cut end is what the customer sees and what starts into the nut, so a chamfer after cutting is usually the difference between a part that assembles and one that does not.
What Cutting & Shearing is the right choice for
- Cutting blanks, studs, threaded rod and tube to length
- High-speed shearing of wire for headers
Where it is the wrong choice
- Sheared ends deform slightly and often need chamfering
- Thermal cutting leaves a heat-affected edge
Parts produced this way
- Custom Bolt — 75 standard parts in the catalog
- Custom Pin — 34 standard parts in the catalog
- Custom Machined Component — 11 standard parts in the catalog
Usually combined with
Cutting & Shearing is rarely the only operation on a part. On most jobs it sits in a sequence with:
Order terms
- Minimum order
- 2,000–5,000 pieces. The exact figure depends on the part: it is set by the tooling the drawing calls for, and is confirmed when the drawing has been reviewed.
- Samples
- Within 7 days of drawing approval.
- Drawing
- Preferred, but not required — a sample, photographs or a sketch is enough to start.
What a quotation needs
Nine things, and a drawing settles most of them at once. Where a field is unknown, say so — an assumption stated is better than a blank, and several of these can be recommended rather than specified.
- Drawing
- A 2D drawing (PDF or DWG) or a 3D model settles almost every other question on this list at once.
- Dimensions
- Diameter, length, head size and any features — enough to know what is being made.
- Tolerance
- Tolerance is the single biggest cost driver. Tell us which dimensions are critical and which are not — holding everything tight costs money on features nobody measures.
- Material
- Carbon steel, alloy steel, stainless, brass, aluminium, titanium — or the application, and we will suggest one.
- Strength grade
- Property class to ISO 898-1 (8.8, 10.9, 12.9) or stainless class to ISO 3506 (A2-70, A4-80). This decides the material and the heat treatment together.
- Thread standard
- Metric coarse, metric fine, UNC, UNF, BSW or a pipe thread — and the tolerance class if it is specified.
- Surface finish
- Zinc, hot-dip galvanised, black oxide, Dacromet, Geomet, nickel, passivation, or plain. Salt-spray hours if you have a requirement.
- Quantity
- Annual volume and first-order quantity. Volume changes which process is the right one, so it changes the price more than most buyers expect.
- Application & environment
- What the part holds together, and what it has to survive — temperature, vibration, chemicals, salt. This is what lets us catch a specification that will not work before it is made.
Questions
What is the minimum order quantity for a custom part?
Between 2,000 and 5,000 pieces for most parts. The exact figure depends on the part: it is set by the tooling the drawing calls for, and is confirmed when the drawing has been reviewed.
How long does a sample take?
Within 7 days once the drawing has been approved. The drawing stage comes first, and for a part being reverse-engineered from a sample it is where most of the time goes.
Can you make a part without a drawing?
Yes. A physical sample, photographs against a scale, or a dimensioned sketch are all workable starting points. A drawing is produced from whichever of those you have and sent back for approval before anything is made.
When is Cutting & Shearing not the right process?
Sheared ends deform slightly and often need chamfering. Thermal cutting leaves a heat-affected edge.
Which fasteners are made by cutting & shearing?
In this catalog: bolt, pin, machined component. Whether it is the right process for a particular part depends on the drawing and the quantity.
Send the part
A drawing answers most of this at once. If you do not have one, fill in what you know and attach a photograph — samples follow within 7 days of the drawing being approved.
