Shearing a hole or a profile out of sheet with a punch and die.

The shearing half of press work, and the reason a stamped washer has a bright band and a rough band on its cut edge — the punch shears part of the thickness and the remainder fractures. Clearance between punch and die is what controls the ratio, and it is set from the material thickness. Where the hole matters more than the outline, punching is done as its own operation rather than in a progressive die.

What Punching is the right choice for

  • Holes and profiles in sheet
  • Secondary holes in already-formed parts
  • Short runs on a turret press, with no dedicated die

Where it is the wrong choice

  • Edge condition is sheared, not machined
  • Minimum hole size is limited by material thickness

Parts produced this way

Usually combined with

Punching is rarely the only operation on a part. On most jobs it sits in a sequence with:

Order terms

Minimum order
2,000–5,000 pieces. The exact figure depends on the part: it is set by the tooling the drawing calls for, and is confirmed when the drawing has been reviewed.
Samples
Within 7 days of drawing approval.
Drawing
Preferred, but not required — a sample, photographs or a sketch is enough to start.

What a quotation needs

Nine things, and a drawing settles most of them at once. Where a field is unknown, say so — an assumption stated is better than a blank, and several of these can be recommended rather than specified.

Drawing
A 2D drawing (PDF or DWG) or a 3D model settles almost every other question on this list at once.
Dimensions
Diameter, length, head size and any features — enough to know what is being made.
Tolerance
Tolerance is the single biggest cost driver. Tell us which dimensions are critical and which are not — holding everything tight costs money on features nobody measures.
Material
Carbon steel, alloy steel, stainless, brass, aluminium, titanium — or the application, and we will suggest one.
Strength grade
Property class to ISO 898-1 (8.8, 10.9, 12.9) or stainless class to ISO 3506 (A2-70, A4-80). This decides the material and the heat treatment together.
Thread standard
Metric coarse, metric fine, UNC, UNF, BSW or a pipe thread — and the tolerance class if it is specified.
Surface finish
Zinc, hot-dip galvanised, black oxide, Dacromet, Geomet, nickel, passivation, or plain. Salt-spray hours if you have a requirement.
Quantity
Annual volume and first-order quantity. Volume changes which process is the right one, so it changes the price more than most buyers expect.
Application & environment
What the part holds together, and what it has to survive — temperature, vibration, chemicals, salt. This is what lets us catch a specification that will not work before it is made.

Questions

What is the minimum order quantity for a custom part?

Between 2,000 and 5,000 pieces for most parts. The exact figure depends on the part: it is set by the tooling the drawing calls for, and is confirmed when the drawing has been reviewed.

How long does a sample take?

Within 7 days once the drawing has been approved. The drawing stage comes first, and for a part being reverse-engineered from a sample it is where most of the time goes.

Can you make a part without a drawing?

Yes. A physical sample, photographs against a scale, or a dimensioned sketch are all workable starting points. A drawing is produced from whichever of those you have and sent back for approval before anything is made.

When is Punching not the right process?

Edge condition is sheared, not machined. Minimum hole size is limited by material thickness.

Which fasteners are made by punching?

In this catalog: washer, support & bracket, panel latch. Whether it is the right process for a particular part depends on the drawing and the quantity.

Send the part

A drawing answers most of this at once. If you do not have one, fill in what you know and attach a photograph — samples follow within 7 days of the drawing being approved.

A 2D drawing (PDF or DWG) or a 3D model settles almost every other question on this list at once.
Diameter, length, head size and any features — enough to know what is being made.
Tolerance is the single biggest cost driver. Tell us which dimensions are critical and which are not — holding everything tight costs money on features nobody measures.
Carbon steel, alloy steel, stainless, brass, aluminium, titanium — or the application, and we will suggest one.
Property class to ISO 898-1 (8.8, 10.9, 12.9) or stainless class to ISO 3506 (A2-70, A4-80). This decides the material and the heat treatment together.
Metric coarse, metric fine, UNC, UNF, BSW or a pipe thread — and the tolerance class if it is specified.
Zinc, hot-dip galvanised, black oxide, Dacromet, Geomet, nickel, passivation, or plain. Salt-spray hours if you have a requirement.
Annual volume and first-order quantity. Volume changes which process is the right one, so it changes the price more than most buyers expect.
What the part holds together, and what it has to survive — temperature, vibration, chemicals, salt. This is what lets us catch a specification that will not work before it is made.
Solve the arithmetic shown in the image.