Warm forging exists because the two neighbouring processes each give something up. Cold forming holds tolerance but cannot move difficult material; hot forging moves anything but loses precision to scale and contraction. Working in between keeps most of the dimensional control while making alloy and stainless grades formable, which is why it turns up on parts that are both demanding in material and awkward in shape.
What Warm Forging is the right choice for
- Alloy and stainless grades that work-harden too fast to cold form
- Shapes needing more deformation than cold forming allows
- Where hot-forged tolerance would mean too much finishing
Where it is the wrong choice
- Tooling and process control are more demanding than either neighbour
- Still not cold-forming tolerance
Parts produced this way
- Custom Bolt — 75 standard parts in the catalog
- Custom Screw — 114 standard parts in the catalog
- Custom Machined Component — 11 standard parts in the catalog
Usually combined with
Warm Forging is rarely the only operation on a part. On most jobs it sits in a sequence with:
Order terms
- Minimum order
- 2,000–5,000 pieces. The exact figure depends on the part: it is set by the tooling the drawing calls for, and is confirmed when the drawing has been reviewed.
- Samples
- Within 7 days of drawing approval.
- Drawing
- Preferred, but not required — a sample, photographs or a sketch is enough to start.
What a quotation needs
Nine things, and a drawing settles most of them at once. Where a field is unknown, say so — an assumption stated is better than a blank, and several of these can be recommended rather than specified.
- Drawing
- A 2D drawing (PDF or DWG) or a 3D model settles almost every other question on this list at once.
- Dimensions
- Diameter, length, head size and any features — enough to know what is being made.
- Tolerance
- Tolerance is the single biggest cost driver. Tell us which dimensions are critical and which are not — holding everything tight costs money on features nobody measures.
- Material
- Carbon steel, alloy steel, stainless, brass, aluminium, titanium — or the application, and we will suggest one.
- Strength grade
- Property class to ISO 898-1 (8.8, 10.9, 12.9) or stainless class to ISO 3506 (A2-70, A4-80). This decides the material and the heat treatment together.
- Thread standard
- Metric coarse, metric fine, UNC, UNF, BSW or a pipe thread — and the tolerance class if it is specified.
- Surface finish
- Zinc, hot-dip galvanised, black oxide, Dacromet, Geomet, nickel, passivation, or plain. Salt-spray hours if you have a requirement.
- Quantity
- Annual volume and first-order quantity. Volume changes which process is the right one, so it changes the price more than most buyers expect.
- Application & environment
- What the part holds together, and what it has to survive — temperature, vibration, chemicals, salt. This is what lets us catch a specification that will not work before it is made.
Questions
What is the minimum order quantity for a custom part?
Between 2,000 and 5,000 pieces for most parts. The exact figure depends on the part: it is set by the tooling the drawing calls for, and is confirmed when the drawing has been reviewed.
How long does a sample take?
Within 7 days once the drawing has been approved. The drawing stage comes first, and for a part being reverse-engineered from a sample it is where most of the time goes.
Can you make a part without a drawing?
Yes. A physical sample, photographs against a scale, or a dimensioned sketch are all workable starting points. A drawing is produced from whichever of those you have and sent back for approval before anything is made.
When is Warm Forging not the right process?
Tooling and process control are more demanding than either neighbour. Still not cold-forming tolerance.
Which fasteners are made by warm forging?
In this catalog: bolt, screw, machined component. Whether it is the right process for a particular part depends on the drawing and the quantity.
Send the part
A drawing answers most of this at once. If you do not have one, fill in what you know and attach a photograph — samples follow within 7 days of the drawing being approved.
