The M20 size of Tension-Control Structural Bolt Assemblies (TC / Twist-Off) is dimensioned by ASTM F3125/F3125M Grade F1852 and F2280. The tables below give the dimensional row from the standard, the drill and spanner sizes that go with it, and the assembly torque per property class. The technical drawing on this page redraws to the exact values selected.
M20 Dimensional Row (ASTM F3125/F3125M Grade F1852 and F2280)
| Size | Thread series | Assembly | Minimum installation tension F1852 (lbf) | Minimum installation tension F2280 (lbf) | Finish | Reference standard |
|---|---|---|---|---|---|---|
| M20 | Metric option | bolt + twist-off nut + washer | Plain, heat-treated alloy steel | ASTM F3125/F3125M Grade F1852 and F2280 |
Spanner & Drive for M20 Tension-Control Structural Bolt Assemblies (TC / Twist-Off)
Drive geometry for M20 Tension-Control Structural Bolt Assemblies (TC / Twist-Off) is given by the row above; match the tool to the listed values.
Hole Sizes for M20
| Coarse-thread pitch (ISO 724) | 2.5 mm |
|---|---|
| Through-hole / clearance (ISO 273 medium) | 22 mm |
| Tapping drill, coarse thread | 17.5 mm |
Tightening Torque for M20
| Class 8.8 (dry, ~µ 0.125) | ≈ 420 Nm |
|---|---|
| Class 10.9 (dry, ~µ 0.125) | ≈ 598 Nm |
| Class 12.9 (dry, ~µ 0.125) | ≈ 700 Nm |
Indicative dry-joint values. Lubrication can lower the required torque by 15–25%. Always confirm against the joint design, especially when going up a strength class.
Proof Load & Strength for M20
| Tensile stress area As (ISO 724) | 245 mm² |
|---|---|
| Proof load, class 8.8 | 147 kN |
| Proof load, class 10.9 | 203 kN |
| Proof load, class 12.9 | 237 kN |
| Min. ultimate tensile load, class 8.8 | 203 kN |
Proof load = tensile stress area × the proof stress Sp of the class, per ISO 898-1 — Sp is a lower figure than the yield stress Rp0.2 and the two are not interchangeable. The stress area is computed from this size's own diameter and pitch, so a fine-pitch designation gives the fine-pitch figure. Design the joint so the working preload stays below the proof load of the class selected.
Installation Tips for M20 Tension-Control Structural Bolt Assemblies (TC / Twist-Off)
- At M20 the stretch in the bolt becomes the controlling factor — for critical joints, use angle-controlled or stretch-controlled tightening instead of pure torque.
When to Step Up or Down from M20
When the joint preload approaches the proof load of M20 class 8.8, step up to M24 class 8.8 (or move to M20 class 10.9). When the joint is over-specified, M16 often saves weight and cost without losing the safety margin.
Custom manufacturing · Made to drawing
Need tension-control structural bolt assemblies (tc / twist-off) in a size this table does not list?
This page covers M20 tension-control structural bolt assemblies (tc / twist-off). Material and finish are usually what drives a special — a grade the standard part is not stocked in, or a coating chosen against a salt-spray figure instead of a default. Made by cold heading or hot forging.
Minimum order from 2,000 pieces; samples within 7 days of drawing approval.